On Sunday, March 3, 2019, the NYCDOT Division of Bridges will conduct bridge testing on the Broadway Bridge over the Harlem River Drive.
As a result of this work, intermittent 15-minute full closures of the bridge will take place beginning at 10:00 a.m.
Additional tests may occur throughout the day. Any queued traffic will be allowed to dissipate in between closures.